Wind
Rippey Wind
Type Wind Farm Substation/Collection
Size 50 Megawatt, 20 Nordex Turbines at 2.5MW per Turbine, Connected to 161kV
Location Grand Junction, Iowa
Description CEG engineered/completed the following: entire substation and underground collection, VAR/voltage and capacitor bank control system, load flow, arc flash, and harmonic studies, protection coordination,relay settings, and SCADA
Description Box Description Box